• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
A 4-Step Process Evaluation Model to Assess the Success of Performance Based Logistics Contracts

A 4-Step Process Evaluation Model to Assess the Success of Performance Based Logistics Contracts

Hardcover

Business GeneralManagement

ISBN10: 1025091442
ISBN13: 9781025091440
Publisher: Hutson Street Press
Published: May 22 2025
Pages: 130
Weight: 0.80
Height: 0.38 Width: 6.14 Depth: 9.21
Language: English

Performance-Based Logistics (PBL) is DoD' s preferred product support approach in order to satisfy vitally-important war fighter needs. The elasticity of these needs makes it impossible to build a one-fits-all template PBL contract with the contractors. Thus, both economic metrics such as Cost per Unit Usage and non-economic metrics such as Availability, Reliability, Logistics Foot Print and Logistics Response Time can be defined and tailored according to each individual program. However, evaluation of the success of a PBL contract gets harder proportional to the increased number of different types of metrics. This research suggests an integrated model approach for combining multiple criteria when assessing the success of a PBL contract. This approach may be used in operational-level decisions such as reward and penalty decisions within a contract, or strategic-level decisions such as extending the contract with the same contractor, terminating the contract and negotiating with other contractors.

1 different editions

Also available

Also from

Buyukgural, Ferit

Also in

Management