Contract Over Target Baseline Effect on Earned Value Management's Cost Performance Index
Paperback
Business GeneralManagementTechnology & Engineering
ISBN13: 9781025130095
Publisher: Hutson Street Press
Published: May 22 2025
Pages: 58
Weight: 0.21
Height: 0.12 Width: 6.14 Depth: 9.21
Language: English
Cost growth is a problem in U.S. Department of Defense (DoD) acquisitions. A particular component of cost growth is a cost overrun or Over Target Baseline (OTB). In 2009, Trahan found that the Gompertz growth curve better predicted program Estimates at Completion (EAC) for OTB contracts. In 2010, Thickstun studied the relationships between overruns and a variety of factors, but found OTB occurrences random and questioned the benefit of the OTB process (Thickstun, 2010). In this research, we study OTB's ability to effect improved program cost performance; we examine OTB's effect on the cumulative Cost Performance Index (CPI) slope after an OTB intervention. We find there is no statistically significant change in cumulative CPI slope after OTB. For the data studied, an OTB investment does not significantly improve management's ability to earn cost value as reflected in the cumulative CPI slope.
This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work.
This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.
As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.
1 different editions
Also available
Contract Over Target Baseline Effect on Earned Value Management's Cost Performance Index
Jack, Dennis E.
Hardcover
Also from
Jack, Dennis E.
Contract Over Target Baseline Effect on Earned Value Management's Cost Performance Index
Jack, Dennis E.
Hardcover
Also in
Business General
Crucial Conversations Tools for Talking When Stakes Are High, Second Edition
Switzler, Al
Grenny, Joseph
Patterson, Kerry
Paperback
The Pig and I: The Tale of Our Relationship with a Beast We Eat
Endresen, Kristoffer Hattleland
Hardcover
Inspired: Understanding Creativity: A Journey Through Art, Science, and the Soul
Richtel, Matt
Hardcover
Quiet Girls Can Run the World: Owning Your Power When You're Not the Alpha in the Room
Holman, Rebecca
Paperback
Inclusive Conversations: Fostering Equity, Empathy, and Belonging Across Differences
Winters, Mary-Frances
Paperback
Disney's Land: Walt Disney and the Invention of the Amusement Park That Changed the World
Richard Snow
Hardcover
Climb: Taking Every Step with Conviction, Courage, and Calculated Risk to Achieve a Thriving Career and a Successful Life
Brown, Carolyn M.
Gadsden-Williams, Michelle
Paperback
The Token: Common Sense Ideas for Increasing Diversity in Your Organization
Farmer, Crystal Byrd
Paperback
Paris Chic & Trendy: Designers' Studios, Hip Boutiques, Vintage Shops
Ribes-Tiphaine, Adrienne
Paperback
The Reverse Centaur's Guide to Life After AI: How to Think about Artificial Intelligence--Before It's Too Late
Doctorow, Cory
Paperback
The Let Them Theory: A Life-Changing Tool That Millions of People Can't Stop Talking about
Robbins, Mel
Robbins, Sawyer
Hardcover
Unreasonable Hospitality: The Remarkable Power of Giving People More Than They Expect
Guidara, Will
Hardcover
Hbr's 10 Must Reads on Managing Yourself, Updated and Expanded (Featuring How Will You Measure Your Life? by Clayton M. Christensen)
Gallo, Amy
Review, Harvard Business
Drucker, Peter F.
Paperback
The Risk Worth Taking: A Story of Breaking Free and Trading for a Life You Love
Ijeoma, Teri
Hardcover
The Goal: 40th Anniversary Edition: A Process of Ongoing Improvement
Cox, Jeff
Goldratt, Eliyahu M.
Paperback
1873: The Rothschilds, the First Great Depression, and the Making of the Modern World
Ahamed, Liaquat
Hardcover
Focused & Fearless Leadership: Preventing the Crisis Before It Starts
Overton, Melissa Godwin
Paperback
The Retire Sooner Method: The 5 Secrets Behind America's Happiest (and Unhappiest) Retirees
Moss, Wes
Hardcover
Hbr's 10 Must Reads on Mental Toughness, Updated and Expanded (Featuring How to Stop Worrying about What Other People Think of You by Michael Gervais)
Duckworth, Angela L.
Review, Harvard Business
Gervais, Michael
Paperback
Hbr's 10 Must Reads on Leadership, Updated and Expanded (Featuring Begin with Trust by Frances X. Frei and Anne Morriss)
Ibarra, Herminia
Review, Harvard Business
Edmondson, Amy C.
Paperback
Crucial Conversations: Tools for Talking When Stakes Are High
Grenny, Joseph
McMillan, Ron
Patterson, Kerry
Paperback
The Everywhere Millionaire: Who Is Really Rich in America and How They Got There
Zidar, Owen
Zwick, Eric
Hardcover
Take Breaks, Work Better: Measure Impact, Not Hours, and Transform Your Profitability
Briggs, John
Paperback
How to Be a Rich Old Lady: Your Guide to Easy Investing, Building Wealth, and Creating the Wild, Beautiful Life You Want
Holden, Amanda
Hardcover
How We Could: The Framework to Lead Without Drama, Build Alignment, and Call Teams to Greatness
Dorr, Alex
Hardcover
Money Unlocked: How to Make It, Keep It and Multiply It: The New York Times Bestseller
Lee, John
Paperback
The Mom Test: How to talk to customers & learn if your business is a good idea when everyone is lying to you
Fitzpatrick, Rob
Paperback
Conversation: How to Connect with Anyone & Make Every Interaction Count
Van Edwards, Vanessa
Hardcover
The Infinity Machine: Demis Hassabis, Deepmind, and the Quest for Superintelligence
Mallaby, Sebastian
Hardcover
Who Moved My Cheese?: An A-Mazing Way to Deal with Change in Your Work and in Your Life
Johnson, Spencer
Hardcover
The Freedom-Based Business Method: Reset, Systemize, and Realign Your Business to Live a Life of Harmony
Ellis, Natalie
Hardcover
A Guide to the Project Management Body of Knowledge (Pmbok(r) Guide) -- Eighth Edition and the Standard for Project Management
Project Management Institute
Paperback
The Courage to Commit: Embrace the Radical Power of Sticking with Something
East, Andrew
Johnson, Shawn
Hardcover
The Millionaire Next Door: The Surprising Secrets of America's Wealthy
Stanley, Thomas J., PH. D.
Danko, William D., PH. D.
Paperback
Dummies Guide to Starting Your Own Business: Essential Steps to Launching and Scaling a Successful Small Business Venture
Press, Essywrites
Paperback
Confidence (HBR Emotional Intelligence Series)
Chamorro-Premuzic, Tomas
Review, Harvard Business
Kanter, Rosabeth Moss
Paperback
7-Figure Educator: Turn Your Experience as an Educator Into Income, Impact, and Freedom
Jordan-Thomas, Erica
Paperback
Surrender to Lead: The Counterintuitive Approach to Driving Extraordinary Results
Kriegel, Jessica
Terry, Joe
Hardcover
Never Split the Difference: Negotiating as If Your Life Depended on It
Voss, Chris
Raz, Tahl
Hardcover
I Will Teach You to Be Rich: No Guilt. No Excuses. Just a 6-Week Program That Works (Second Edition)
Sethi, Ramit
Paperback
Get Scalable: The Operating System Your Business Needs To Run and Scale Without You
Deiss, Ryan
Paperback
Fans First: Change The Game, Break the Rules & Create an Unforgettable Experience
Cole, Jesse
Paperback
What the Heck Is Eos?: A Complete Guide for Employees in Companies Running on EOS
Wickman, Gino
Bouwer, Tom
Hardcover
The Coaching Habit: Say Less, Ask More, and Change the Way You Lead Forever
Stanier, Michael Bungay
Paperback
Mindful Listening (HBR Emotional Intelligence Series)
Review, Harvard Business
Hougaard, Rasmus
Zenger, Jack
Paperback
Twenty Minutes Is the New Hour: The Ambitious Woman's Guide to Doing Less and Achieving More
Hauser, Fran
Hardcover
The Overthinker's Guide to Making Decisions: How to Make Decisions Without Losing Your Mind
Nguyen, Joseph
Hardcover
How to Work with Complicated People: Strategies for Effective Collaboration with (Nearly) Anyone
Leak, Ryan
Hardcover
Crucial Accountability: Proven Skills to Build Trust, Address Disappointment, and Get Results, Third Edition
Patterson, Kerry
Grenny, Joseph
Hale, Justin
Hardcover
Atlas of the Heart: Mapping Meaningful Connection and the Language of Human Experience
Brown, Brené
Hardcover
Stop Asking for Referrals: Build a Magnetic Business Through Intentional Care & Real Relationships
McNally, Flor de Maria
Paperback
Expecting Better: Why the Conventional Pregnancy Wisdom Is Wrong--and What You Really Need to Know
Oster, Emily
Paperback
Hábitos Atómicos: Cambios Pequeños, Resultados Extraordinarios / Atomic Habits
Clear, James
Paperback
The Eureka Machine: Why AI Is the Key to Unlocking a New Era of Scientific Discoveries
Socher, Richard
Hardcover
Influence and Persuasion (HBR Emotional Intelligence Series)
Morgan, Nick
Cialdini, Robert B.
Review, Harvard Business
Paperback
Mindfulness (HBR Emotional Intelligence Series)
Goleman, Daniel
Review, Harvard Business
Langer, Ellen
Paperback
A Little More Social: How Small Choices Create Unexpected Happiness, Health, and Connection
Epley, Nicholas
Hardcover
Money to Burn: The Unvarnished Truth about Leon Black, Apollo, and the Rise of a New Wall Street
Cohan, William D.
Hardcover
Happiness (HBR Emotional Intelligence Series)
Review, Harvard Business
McKee, Annie
Gilbert, Daniel
Paperback
Power and Impact (HBR Emotional Intelligence Series)
Bregman, Peter
Review, Harvard Business
Cable, Dan
Paperback
Building Great Businesses: Create Momentum, Overcome Setbacks, and Scale with Confidence
Becker, Scott
Hardcover
Hbr's 10 Must Reads on High Performance, Updated and Expanded (Featuring Nine Things Successful People Do Differently by Heidi Grant)
Goleman, Daniel
Review, Harvard Business
Grant, Heidi
Paperback
Hbr's 10 Must Reads on Strategy, Updated and Expanded (Featuring the Five Competitive Forces That Shape Strategy by Michael E. Porter)
Kim, W. Chan
Review, Harvard Business
Porter, Michael E.
Paperback
Getting to Yes: Negotiating Agreement Without Giving in
Fisher, Roger
Ury, William
Patton, Bruce
Paperback
Hbr's 10 Must Reads on Managing People, Updated and Expanded (Featuring Are You a Good Boss--Or a Great One? by Linda A. Hill and Kent Lineback)
Hill, Linda A.
Review, Harvard Business
Goleman, Daniel
Paperback
The Algorithm: The Hypergrowth Formula That Transformed Tesla, Lululemon, General Motors, and Spacex
McNeill, Jon
Hardcover
Competing in the Age of AI: Strategy and Leadership When Algorithms and Networks Run the World
Iansiti, Marco
Lakhani, Karim R.
Hardcover
No Experience Necessary: Why Betting on Yourself in Your Twenties Is the Best Decision You'll Ever Make
Harary, Ronnen
Hardcover
From Operator to Owner: The Entrepreneur's Guide to Running a Business That Doesn't Run You
Landry, Liz
Hardcover
Inside the Owner's Box: Conversations on Power and Leadership in Sports
Rubenstein, David M.
Hardcover
The Way of Excellence: A Guide to True Greatness and Deep Satisfaction in a Chaotic World
Stulberg, Brad
Hardcover
