• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
A Decomposition Approach for the Multi-Modal, Resource-Constrained, Multi-Project Scheduling Problem With Generalized Precedence and Expediting Resour

A Decomposition Approach for the Multi-Modal, Resource-Constrained, Multi-Project Scheduling Problem With Generalized Precedence and Expediting Resour

Paperback

Business GeneralManagementGeneral Mathematics

ISBN10: 1025097602
ISBN13: 9781025097602
Publisher: Hutson Street Press
Published: May 22 2025
Pages: 276
Weight: 0.86
Height: 0.58 Width: 6.14 Depth: 9.21
Language: English

The field of project scheduling has received a great deal of study for many years with a steady evolution of problem complexity and solution methodologies. As solution methodologies and technologies improve, increasingly complex, real-world problems are addressed, presenting researchers a continuing challenge to find ever more effective means for approaching project scheduling. This dissertation introduces a project scheduling problem which is applicable across a broad spectrum of real-world situations. The problem is based on the well-known Resource-Constrained Project Scheduling Problem, extended in this dissertation to include generalized precedence with minimal and maximal time lags and expediting resources. The problem is further extended to include multiple projects which have generalized precedence, renewable and nonrenewable resources, and expediting resources at the program level.

1 different editions

Also available

Also in

Business General