• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
A Statistical Account of the Schuylkill Permanent Bridge, commenced September 5Th 1801, opened January 1St,1805, communicated to the Philadelphia Soci

A Statistical Account of the Schuylkill Permanent Bridge, commenced September 5Th 1801, opened January 1St,1805, communicated to the Philadelphia Soci

Hardcover

Technology & Engineering

ISBN10: 1020317086
ISBN13: 9781020317088
Publisher: Legare Street Pr
Published: Jul 18 2023
Pages: 76
Weight: 0.63
Height: 0.25 Width: 6.14 Depth: 9.21
Language: English

This detailed statistical report provides a comprehensive look at the construction and operation of the Schuylkill Permanent Bridge, one of the most advanced engineering projects of its time. Drawing on a wide range of data and analysis, the report offers insights into the economics, design, and construction of this marvel of early American infrastructure. With its clear and concise language, this report is an invaluable resource for anyone interested in the history of engineering and transportation.

Also from

Anonymous

Also in

Technology & Engineering