• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Safety Evaluation Report for an Early Site Permit (ESP) at the North Anna ESP Site

Safety Evaluation Report for an Early Site Permit (ESP) at the North Anna ESP Site

Paperback

Technology & Engineering

ISBN10: 1500610836
ISBN13: 9781500610838
Publisher: Createspace
Published: Jul 22 2014
Pages: 104
Weight: 0.58
Height: 0.22 Width: 8.50 Depth: 11.00
Language: English
Dominion Nuclear North Anna, LLC submitted its application for an early site permit (ESP) for the North Anna site on September 25, 2003. Then, on April 13, 2006, Dominion submitted Revision 6 of the application to propose a change tothe cooling system for postulated Unit 3, and an increase in the power level for both postulated Units 3 and 4.

Also in

Technology & Engineering