• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Pmp(r)/Capm(r) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method

Pmp(r)/Capm(r) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method

Paperback

Business General

ISBN10: 161434504X
ISBN13: 9781614345046
Publisher: Booklocker.Com Inc
Published: Oct 31 2011
Pages: 118
Weight: 0.48
Height: 0.25 Width: 7.00 Depth: 10.00
Language: English
A thorough and in-depth preparation guide for PMP(R) and CAPM(R) exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on special situations. Explanation of concepts through stepwise solved examples will provide readers hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams.

Also in

Business General