• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control

Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control

Paperback

Business GeneralManagement

Currently unavailable to order

ISBN10: 3662521377
ISBN13: 9783662521373
Publisher: Springer Nature
Published: Aug 27 2016
Pages: 318
Weight: 1.04
Height: 0.70 Width: 6.14 Depth: 9.21
Language: English

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.

Also in

Business General