• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Paperback

General ReferenceTechnology & Engineering

ISBN10: 1503254712
ISBN13: 9781503254718
Publisher: Createspace
Published: Dec 31 2014
Pages: 94
Weight: 0.53
Height: 0.19 Width: 8.50 Depth: 11.02
Language: English
The Navy's proposed FY2014 budget requests funding for the procurement of 8 new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The 8 ships include two Virginia-class attack submarines, one DDG-51 class Aegis destroyer, four Littoral Combat Ships (LCSs), and one Mobile Landing Platform/Afloat Forward Staging Base (MLP/AFSB) ship. The Navy's proposed FY2014-FY2018 five-year shipbuilding plan includes a total of 41 ships-the same number as in the Navy's FY213-FY2017 five-year shipbuilding plan, and one less than the 42 ships that the Navy planned for FY2014-FY2018 under the FY2013 budget submission.

1 different editions

Also available

Also in

Technology & Engineering