• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Lessons Learned From Early Implementation of the Maintenance Rule at Nine Nuclear Power Plants

Lessons Learned From Early Implementation of the Maintenance Rule at Nine Nuclear Power Plants

Paperback

Technology & Engineering

ISBN10: 1500202215
ISBN13: 9781500202217
Publisher: Createspace
Published: Jun 14 2014
Pages: 48
Weight: 0.30
Height: 0.10 Width: 8.50 Depth: 11.02
Language: English
This report summarizing the lessons learned from the nine pilot site visits that were performed to review early implementation of the maintenance rule using the draft NRC Maintenance Inspection Procedure.

Also in

Technology & Engineering