• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants

Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants

Paperback

Technology & Engineering

ISBN10: 1500374741
ISBN13: 9781500374747
Publisher: Createspace
Published: Jun 30 2014
Pages: 38
Weight: 0.25
Height: 0.08 Width: 8.50 Depth: 11.00
Language: English
In this NUREG, the staff of the U.S. Nuclear Regulatory Commission (NRC) discusses the applicable regulations for the inservice testing of pumps and valves and the examination and testing of dynamic restraints (snubbers) at commercial nuclear power plants. The information in NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants, Revision 0, issued April 1995, and Revision 1, issued January 2005, has described this topic in the past. This NUREG report replaces Revision 0 and Revision 1 to NUREG-1482 and is applicable, unless stated otherwise, to all editions and addenda to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (OM Code), which Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(b) incorporates by reference. In addition, the staff discusses other inservice test program topics such as the NRC process for the review of the OM Code, conditions on the use of the OM Code, and interpretations of the OM Code.

Also in

Technology & Engineering