• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing: Appendices A through L

Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing: Appendices A through L

Paperback

Technology & Engineering

ISBN10: 150061131X
ISBN13: 9781500611316
Publisher: Createspace
Published: Jul 22 2014
Pages: 396
Weight: 2.01
Height: 0.81 Width: 8.50 Depth: 11.02
Language: English
The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a Framework that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.

2 different editions

Also available

Also in

Technology & Engineering