Earned Value Management to control technical software development: Do projects once, do them right, earn the value!
Paperback
Technology & EngineeringProgramming
Publisher: Independently Published
Published: Nov 19 2026
Pages: 150
Weight: 0.60
Height: 0.32 Width: 7.00 Depth: 10.00
Language: English
Also in
Technology & Engineering
All Data Are Local: Thinking Critically in a Data-Driven Society
Loukissas, Yanni Alexander
Paperback
The Age of Living Machines: How Biology Will Build the Next Technology Revolution
Hockfield, Susan
Paperback
Ingenious Patents: Bubble Wrap, Barbed Wire, Bionic Eyes, and Other Pioneering Inventions
Ikenson, Ben
Bennett, Jay
Hardcover
Thinking Machines: The Quest for Artificial Intelligence--and Where It's Taking Us Next
Dormehl, Luke
Paperback
The Reverse Centaur's Guide to Life After AI: How to Think about Artificial Intelligence--Before It's Too Late
Doctorow, Cory
Paperback
The Agi Chronicles: The Inside Story of the Race to Create an Artificial Superintelligence
Roose, Kevin
Hardcover
Improvised Munitions Black Book: Complete and Unabridged in One Volume: Complete and Unabridged in One Volume
U S Government
Paperback
You Don't Need a Smartphone: A Practical Guide to Downgrading Your Phone and Upgrading Your Life
Lamm, August
Paperback
Basic Butchering of Livestock & Game: Beef, Veal, Pork, Lamb, Poultry, Rabbit, Venison
Mettler, John J.
Paperback
The Infinity Machine: Demis Hassabis, Deepmind, and the Quest for Superintelligence
Mallaby, Sebastian
Hardcover
Ultimate Guide: Wiring, Updated 10th Edition: Meets Current National Electrical Code Standards
The Editors of Creative Homeowner
Paperback
AI for Good: How Real People Are Using Artificial Intelligence to Fix Things That Matter
Tyrangiel, Josh
Hardcover
The Story of Your Life: How Social Media Shapes the Way We Experience Everything
Jezer-Morton, Kathryn
Hardcover
Kobuk the Destroyer: And Other Tales from the Wild, Unseen World of Test Engineering
Davies, Alex
Hardcover
Lightning Beneath the Sea: The Race to Wire the World and the Dawn of the Information Age
Tabor, James M.
Hardcover
Like, Follow, Subscribe: Influencer Kids and the Cost of a Childhood Online
Latifi, Fortesa
Hardcover
The Boy Who Harnessed the Wind: Creating Currents of Electricity and Hope
Kamkwamba, William
Mealer, Bryan
Paperback
Midnight in Chernobyl: The Untold Story of the World's Greatest Nuclear Disaster
Higginbotham, Adam
Paperback
Empire of Ink: The Printers, Rogues, and Radicals Who Invented the American Newspaper
Wright, Alex
Hardcover
The Ultimate Guide to Rebuilding a Civilization: A Technical Manual for the Post-Collapse Era
Evans, James
Paperback
The Home Blacksmith: Tools, Techniques, and 40 Practical Projects for the Home Blacksmith
Ridgway, Ryan
Paperback
No One's Coming: The Rogue Heroes Our Government Turns to When There's Nowhere Else to Turn
Hazzard, Kevin
Hardcover
A Brief History of Cities in 32 Inventions: The Ideas and Technologies That Made Modernity Possible
Elledge, Jonn
Hardcover
City on the Edge: Technology, Politics, and the Fight for the Soul of San Francisco
Weber, Jonathan
Hardcover
Curved Air: A Biography of Sickle Cell Anemia and the Quest to Cure the First Molecular Disease
Davies, Kevin
Hardcover
AI Snake Oil: What Artificial Intelligence Can Do, What It Can't, and How to Tell the Difference
Narayanan, Arvind
Kapoor, Sayash
Paperback
The Bitter Struggle: Superintelligence, Superpowers, and the Fate of the World
Buchanan, Ben
Collins, Tantum
Hardcover
Atlas of AI: Power, Politics, and the Planetary Costs of Artificial Intelligence
Crawford, Kate
Paperback
The Problem with Plastic: How We Can Save Ourselves and Our Planet Before It's Too Late
Beyond Plastics
Enck, Judith
Mahoney, Adam
Hardcover
The Elements of Power: A Story of War, Technology, and the Dirtiest Supply Chain on Earth
Niarchos, Nicolas
Hardcover
CompTIA Tech+ Certification All-in-One Exam Guide, Third Edition (Exam FC0-U71)
Wempen, Faithe
Paperback
Crisis Engineering: Time-Tested Tools for Turning Chaos Into Clarity
Nitze, Marina
Weaver, Matthew
Dickerson, Mikey
Paperback
Elon Take the Wheel: The Danger and Delusion of Tesla's Self-Driving Technology
Niedermeyer, Edward
Hardcover
Generation Regeneration: Codesigning the Future of Cities Through Regenerative Placemaking
Cho, Tony
Hardcover
Artificial Intelligence: A Guide for Thinking Humans (with a New Preface)
Mitchell, Melanie
Paperback
The Bullwhip's Algorithm: Artificial Intelligence and America's Racial Caste System
Bobb, Kamau
Hardcover
Bringing Columbia Home: The Untold Story of a Lost Space Shuttle and Her Crew
Leinbach, Michael D.
Ward, Jonathan H.
Paperback
Human + Machine, Updated and Expanded: Reimagining Work in the Age of AI
Daugherty, Paul R.
Wilson, H. James
Hardcover
Cadillac Desert: The American West and Its Disappearing Water, Revised Edition
Reisner, Marc
Paperback
Make: Electronics: Learning by Discovery: A Hands-On Primer for the New Electronics Enthusiast
Platt, Charles
Paperback
How to Use an Oscilloscope 2026: Master Measurement Skills for Electronics Beginners and Pros
Grant, Nathaniel Cole
Paperback
CNC Woodworking for the Absolute Beginner: Winning Tips, Techniques & 5 Skill-Building Projects
Bagnall, Ralph
Paperback
Pilot's Handbook of Aeronautical Knowledge: Faa-H-8083-25c
Federal Aviation Administration (FAA)
Hardcover
The New Age of Sexism: How AI and Emerging Technologies Are Reinventing Misogyny
Bates, Laura
Hardcover
Try Turning It Off and on Again: The Wonder and Weirdness of the Software That Runs Our World
Le Goues, Claire
Hardcover
Air Force Handbook 10-644 Survival Evasion Resistance Escape SERE Operations: 27 March 2017
The Air Force, Department of
Paperback
Meat: How the Next Agricultural Revolution Will Transform Humanity's Favorite Food--And Our Future
Friedrich, Bruce
Hardcover
ASE Technician Test Preparation Automotive Maintenance and Light Repair (G1)
Delmar Cengage Learning
Paperback
Bioinspired: How Nature Made Us Modern, Drives Today's Technological Innovation, and Inspires a Future Worth Inventing
Stier, Samuel Cord
Hardcover
Essential Off-Grid Survival Projects: 50 Life-Saving Solutions for Shelter, Water, Food, and Safety
Furneaux, Ky
Hardcover
AI Projects with Raspberry Pi: High-Performance Artificial Intelligence for Robotics, Security, Home Automation, and Vision
Jepson, Brian
Hattersley, Lucy
Paperback
Reinventing Wool: How a Natural Fiber Survived the Synthetic Revolution
Littlefield, Melissa M.
Hardcover
Disneyland and the Rise of Automation: How Technology Created the Happiest Place on Earth
Betancourt, Roland
Hardcover
Inconspicuous Consumption: The Environmental Impact You Don't Know You Have
Schlossberg, Tatiana
Paperback
Agentic Artificial Intelligence: Harnessing AI Agents to Reinvent Business, Work, and Life
Wirtz, Jochen
Davenport, Thomas H.
Bornet
Paperback
Broken Money: Why Our Financial System is Failing Us and How We Can Make it Better
Alden, Lyn
Paperback
The Coming Wave: Technology, Power, and the Twenty-First Century's Greatest Dilemma
Suleyman, Mustafa
Hardcover
The Shortest History of Innovation: From the Wheel to Gene Editing, Ai, and Beyond - How New Ideas Shape Our World
Leigh, Andrew
Paperback
Tubes: A Journey to the Center of the Internet with a New Introduction by the Author
Blum, Andrew
Paperback
High-Wing Aircraft Visualized Flight Maneuvers Manual: For Pilots in Training
ASA Test Prep Board
Paperback
Drawing Lessons with Da Vinci: An Artist's Guide to Geometry, Anatomy and Proportion
Roig, Gabriel Martín
Paperback
The Trillion Dollar War Machine: How Runaway Military Spending Drives America Into Foreign Wars and Bankrupts Us at Home
Hartung, William D.
Freeman, Ben
Hardcover
AI Snake Oil: What Artificial Intelligence Can Do, What It Can't, and How to Tell the Difference
Narayanan, Arvind
Kapoor, Sayash
Hardcover
Texas DMV Driver's Handbook: Practice for the Texas Permit Test with 350+ Driving Questions and Answers
Prep, Discover
Paperback
How to Survive When the Grid Goes Down: The Ultimate Grid-Down Survival Guide For Thriving in a World Without Power
Bennett, Anthony
Paperback
Bug-In Home Survival Guide For American Dads: Fortress Your Family Before The Next Blackout & Empty Shelves Hit Ex-SEAL's 90-Day Protocol To Defend Yo
Garrison, Ryan
Editions, Euphelia
Paperback
Engineering in Plain Sight: An Illustrated Field Guide to the Constructed Environment
Hillhouse, Grady
Hardcover
