• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Environmental and Social Impact Assessment for the 132 kV Power Project in Bensa Daye, Ethiopia

Environmental and Social Impact Assessment for the 132 kV Power Project in Bensa Daye, Ethiopia

Paperback

Technology & Engineering

ISBN10: 334668010X
ISBN13: 9783346680105
Publisher: Grin Verlag
Published: Apr 28 2022
Pages: 216
Weight: 0.63
Height: 0.49 Width: 5.83 Depth: 8.27
Language: English
Project Report in the subject Energy Sciences, language: English, abstract: Bensa Daye 132kV Power Transmission Line and Substation Project have been selected by EEP as its key priority project to meet the growing demand in the area. It will address the need to transfer the energy generated to areas of residential consumption located in and around different woreda. The fundamental objective of this ESIA was to provide a means whereby the overall environmental performance of the project can be enhanced through identification of potentially beneficial and adverse impacts associated with project implementation and subsequent operation. It is also to adopt measures to enhance beneficial impacts and to avoid, minimize, or offset adverse impacts.

Also in

Technology & Engineering