• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Investigation of Loss Control Grand Isle Block 90, Well C-7ST OCS-G 4003

Investigation of Loss Control Grand Isle Block 90, Well C-7ST OCS-G 4003

Paperback

General Reference

ISBN10: 1503272206
ISBN13: 9781503272200
Publisher: Createspace
Published: Jan 3 2015
Pages: 32
Weight: 0.22
Height: 0.07 Width: 8.50 Depth: 11.02
Language: English
In November 2002, the Diamond Offshore Drilling, Inc. (hereinafter referred to as Contractor or DODI) jack-up rig Ocean King (hereinafter referred to as the Rig) was engaged in drilling operations for BP Exploration & Production Inc. on Grand Isle (GI) Block 90 Well C-7 sidetrack (ST). The Rig was in place next to the GI 93 C platform (hereinafter referred to as the Platform). Drilling operations were being conducted with the Rig cantilevered over the Platform using the re-claimed slot of the C-7 well, which had been plugged and abandoned (P&A'd).

Also in

General Reference