• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Estimating Performance Time for Air Force Military Construction Projects

Estimating Performance Time for Air Force Military Construction Projects

Paperback

Business GeneralTechnology & EngineeringGeneral Education

ISBN10: 1288397771
ISBN13: 9781288397778
Publisher: Biblioscholar
Published: Dec 4 2012
Pages: 232
Weight: 0.73
Height: 0.49 Width: 6.14 Depth: 9.21
Language: English

The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects.As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations.

Also in

General Education