Zero Float: A CONSTRUCTION INDUSTRY THRILLER (The Critical Path Series, Book 1)
Paperback
Please select the version of book you would like to purchase.
ISBN13: 9798191153568
Publisher: Independently Published
Published: Aug 6 2026
Pages: 284
Weight: 0.84
Height: 0.64 Width: 6.00 Depth: 9.00
Language: English
Publisher: Independently Published
Published: Aug 6 2026
Pages: 284
Weight: 0.84
Height: 0.64 Width: 6.00 Depth: 9.00
Language: English
ZERO FLOAT: A Construction Industry Thriller (The Critical Path Series, Book 1) By Mason Sterling Every delay has a cost. Every shortcut leaves evidence. A structure fails long before it collapses. It fails the day someone decides the paperwork can carry a load the concrete can't. The Hook: A Building is Built Twice Every major infrastructure project is constructed twice: once in concrete and once in a story told through paperwork. But in a world of immovable deadlines and movable truths, the story and the structure often begin to diverge. For graduate site engineer Ethan Cole, a signature is about to become more dangerous than a falling crane. The Story: The Baseline Lie Ethan Cole is twenty-four years old and four days into his first job at the St. Catherine Medical Center-a landmark hospital project already thirteen months late and under intense political fire. While the public is promised a grand opening, Ethan discovers The Baseline Lie: a project schedule that looks perfect on a corporate dashboard but is physically impossible to build. As the project reaches Zero Float-the point where every single second of delay impacts the final deadline-the pressure to manage documentary exposure turns lethal. When a structural collapse leaves a man dead, Ethan is forced to choose between the honest reporting that could bankrupt the project and the generous reporting required to keep four hundred families paid. The system does not need you innocent. It only needs you useful. Why Readers Love This Series
- Technical Insider Authority: Drawing on years of exposure to how large infrastructure actually gets built, Mason Sterling provides a rare, authoritative view of the high-pressure world where money, power, and engineering judgment collide.
- High-Stakes Industrial Noir Perfect for fans of Michael Crichton and J. Luke Bennecke, this series blends white-knuckle suspense with the technical realism of forensic engineering-from logic ties to metadata trails of a corporate cover-up [87, 187, Previous Advice].
- Atmospheric Realism: A sensory journey into a site described as twelve different wars sharing elevators, smelling of instant coffee and diesel, where the floor is never quite level underfoot.
- Trilogy Momentum: Zero Float is the gripping first entry in The Critical Path Series, followed by The Variation Order and Ground Conditions. Follow Ethan Cole's evolution from a naive graduate to a powerful director who learns that leverage is the only thing stronger than steel.
- Book 1: Zero Float
- Book 2: The Variation Order
- Book 3: Ground Conditions
Also in
Mystery & Thriller
Sabine's Notebook: In Which the Extraordinary Correspondence of Griffin & Sabine Continues
Bantock, Nick
Hardcover
$10.99
The Girl with the Dragon Tattoo (Movie Tie-In Edition): Book 1 of the Millennium Trilogy
Larsson, Stieg
Paperback
$9.99
The Golden Mean: In Which the Extraordinary Correspondence of Griffin & Sabine Concludes
Bantock, Nick
Hardcover
$9.99
The Killer Inside Me the Killer Inside Me the Killer Inside Me the Killer Inside Me the Killer Insid
Thompson, Jim
Paperback
$8.99
The Pirate Queen: A Novel from the New York Times Bestselling Author of the Frozen River
Lawhon, Ariel
Hardcover
$28.80
Big Little Truths: Reese's Book Club: A Novel: The Sequel to Big Little Lies
Moriarty, Liane
Hardcover
$30.60
The Altar of Pergamon: The Mystery of the Dark Angel and the Future of the World
Cahn, Jonathan
Hardcover
$28.49
