• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Time-To-Build: Interrelated Investment and Labour Demand Modelling with Applications to Six OECD Countries

Time-To-Build: Interrelated Investment and Labour Demand Modelling with Applications to Six OECD Countries

Paperback

Series: Lecture Notes in Economic and Mathematical Systems, Book 420

EconomicsInvesting & FinanceGeneral Political Science

ISBN10: 3540588094
ISBN13: 9783540588092
Publisher: Springer Nature
Published: Feb 17 1995
Pages: 204
Weight: 0.69
Height: 0.46 Width: 6.14 Depth: 9.21
Language: English
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.

Also in

Investing & Finance