• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
USS Amphitrite (Bm-2)

USS Amphitrite (Bm-2)

Paperback

ISBN10: 5511946540
ISBN13: 9785511946542
Publisher: Book On Demand Ltd
Published: Jan 28 2013
Pages: 108
Weight: 0.58
Height: 0.22 Width: 8.25 Depth: 11.00
Language: English
High Quality Content by WIKIPEDIA articles! The second USS Amphitrite-the lead ship in her class of iron-hulled, twin-screw monitors-was laid down in 1874 at Wilmington, Delaware, by the Harlan and Hollingsworth yard; launched on 7 June 1883; sponsored by Miss Nellie Benson, the daughter of a Harlan and Hollingsworth official; and commissioned at the Norfolk Navy Yard, Portsmouth, Virginia, on 23 April 1895, Captain William C. Wise in command. Rapid changes in naval technology and doctrine during the two decades she was under construction had repeatedly delayed her progress, and she was redesigned twice while still under construction.