• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Lunar Surface Operations, Part 1: Post-Touchdown Lunar Surface and System Checkouts

Lunar Surface Operations, Part 1: Post-Touchdown Lunar Surface and System Checkouts

Paperback

General Political Science

ISBN10: 1289164355
ISBN13: 9781289164355
Publisher: Bibliogov
Published: Jul 15 2013
Pages: 54
Weight: 0.25
Height: 0.11 Width: 7.44 Depth: 9.69
Language: English
This slide presentation reviews the first part of the post-touchdown lunar surface and system checkout tasks. A stay/no stay decision for the lunar lander was made based on the questions: Is the Lunar Module (LM) stable on the lunar surface?; Are there any time critical systems failures or trends indicating impending loss of capability to ascent and achieve a safe lunar orbit?; and Is there loss of capability in critical LM systems? The sequence of these decisions is given as a time after touchdown on the surface of the moon. After the decision to stay is made the next task is to checkout status of the lunar module. While the status of the lunar module is checking out certain conditions, the Command Service Module was also engaged in certain checkout activities.

Also in

General Political Science