• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Gert Networks and the Time-Oriented Evaluation of Projects

Gert Networks and the Time-Oriented Evaluation of Projects

Paperback

Series: Lecture Notes in Economic and Mathematical Systems, Book 172

EconomicsManagementCriminology

ISBN10: 3540097058
ISBN13: 9783540097051
Publisher: Springer Nature
Published: Oct 1 1979
Pages: 272
Weight: 0.98
Height: 0.58 Width: 6.69 Depth: 9.61
Language: English
Towards the end of the fifties methods for planning, scheduling, and control of proj- ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj- ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be- gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before- hand, that every activity and every event are realized exactly once during the exe- cution of the project, and that feedback (corresponding to cycles in the asso- ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.

Also in

Economics