• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, Sou

Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, Sou

Paperback

General Science

ISBN10: 1500140082
ISBN13: 9781500140083
Publisher: Createspace
Published: Jun 9 2014
Pages: 562
Weight: 2.83
Height: 1.14 Width: 8.50 Depth: 11.02
Language: English
On February 28, 2001, Duke COGEMA Stone & Webster (DCS or the applicant), a limited liability company, submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to construct a Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF or the facility) on the U.S. Department of Energy's (DOE) Savannah River Site near Aiken, South Carolina. DCS is a DOE contractor. If its construction authorization request (CAR), as revised, is approved, DCS is expected to then submit a license application for authority to possess and use licensed material at the MFFF. Following an acceptance review of such an application, a notice of opportunity for hearing would be published in the Federal Register. In support of its revised CAR, DCS has submitted several items to the NRC, including a quality assurance plan and an environmental report.

Also in

General Science